Wednesday, 22 January 2014

Film poster and magazine review

In this week we started planning and preparing our print product of the film poster and magazine review. We first started by designing the title/masthead and then went on to the template design of the magazine review. 


Thursday, 9 January 2014

Our pitch of print products and audience feedback



The audience feedback we gathered from this pitch was the issue of using the real monopoly logo. It would be copyright issues. From this we will have to create our own logos which looks like a version of the original logo. The audience thought that the best image for our film review feature would be the worms eye image of when the characters opened the monopoly box. We may use this idea for our film poster. The audience liked the idea of having teaser posters which shows each characters expressions.

Tuesday, 7 January 2014

Case studies on film posters and magazine reviews


If prezi does not work heres the link to the updates version http://prezi.com/pruzwxehi95l/studying-images-used-in-this-film-poster-gives-me-initial-id/

Monday, 16 December 2013

Focus group on short film

In the middle stages whilst editing we had a focus group on our product so far. We did this to gather important audience feedback.
Some of the audience feedback was a good transition in the 'Just the two of us scene' with the music. Also in this scene the interaction between the characters could be between to show that an relationship is siring up.

Thursday, 12 December 2013

Final editing session

We now had a limited time to finish our editing. Whilst editing in the last two session we found that our short film had gone over the specified time allocated of 5 minutes. We were over by about 2 minutes. Our teacher had helped us dramatically by cutting out some shots which were maybe irrelevant but saved us time. The process was painful  because so many shots were removed at once. As the day ended our time was running our. Our short film was almost complete but we had to work hard in the last 30mins to get the last scenes together.
10mins before the deadline we found that we had complete, so we decided to add extra bloopers at the end for audience purposes.        

Thursday, 5 December 2013

Editing session

In this session we found that the problems with the lighting issue was a major setback. We had to get help from the technician to help us colour correct. There was more issues which was the frames per second on the cameras. When we opened files from the first day of footage and tried to merge it with the files from the third day of footage it did not render properly. This was because we used two different cameras with different settings which had different frames per second of 25 and 30. this delayed us a whole session which all the files had to be converted all again.