Monday, 3 February 2014

Film poster

This is our progress with our film poster so far. We have the layout we wanted from looking at a similar convention of horrible bosses. We have adapted our own type of conventions to make a similar product. We have shown the expression on each character's face which we want to portray to the audience.

Tuesday, 28 January 2014

Photoshoot images editing on Photoshop

Moving on forward we have now finished our photoshoot for the poster and now in the process of editing the photos onto the template.

Monday, 27 January 2014

Print products film review



Today we work on finishing our film review, which is almost complete. I personally do not think that the quality of these products reflects our short film although we used some of the on scene shots I think we need to refer back to our audience feedback in our pitch.

Wednesday, 22 January 2014

Film poster and magazine review

In this week we started planning and preparing our print product of the film poster and magazine review. We first started by designing the title/masthead and then went on to the template design of the magazine review. 


Thursday, 9 January 2014

Our pitch of print products and audience feedback



The audience feedback we gathered from this pitch was the issue of using the real monopoly logo. It would be copyright issues. From this we will have to create our own logos which looks like a version of the original logo. The audience thought that the best image for our film review feature would be the worms eye image of when the characters opened the monopoly box. We may use this idea for our film poster. The audience liked the idea of having teaser posters which shows each characters expressions.

Tuesday, 7 January 2014

Case studies on film posters and magazine reviews


If prezi does not work heres the link to the updates version http://prezi.com/pruzwxehi95l/studying-images-used-in-this-film-poster-gives-me-initial-id/

Monday, 16 December 2013

Focus group on short film

In the middle stages whilst editing we had a focus group on our product so far. We did this to gather important audience feedback.
Some of the audience feedback was a good transition in the 'Just the two of us scene' with the music. Also in this scene the interaction between the characters could be between to show that an relationship is siring up.

Thursday, 12 December 2013

Final editing session

We now had a limited time to finish our editing. Whilst editing in the last two session we found that our short film had gone over the specified time allocated of 5 minutes. We were over by about 2 minutes. Our teacher had helped us dramatically by cutting out some shots which were maybe irrelevant but saved us time. The process was painful  because so many shots were removed at once. As the day ended our time was running our. Our short film was almost complete but we had to work hard in the last 30mins to get the last scenes together.
10mins before the deadline we found that we had complete, so we decided to add extra bloopers at the end for audience purposes.        

Thursday, 5 December 2013

Editing session

In this session we found that the problems with the lighting issue was a major setback. We had to get help from the technician to help us colour correct. There was more issues which was the frames per second on the cameras. When we opened files from the first day of footage and tried to merge it with the files from the third day of footage it did not render properly. This was because we used two different cameras with different settings which had different frames per second of 25 and 30. this delayed us a whole session which all the files had to be converted all again.

Friday, 22 November 2013

Images for print products


Whilst editing we thought of some ways which we could use some stills to import into our print products. 
Here are all the images we too which we will now ask for audience feedback on which is the best images to use for our print products. 















Monday, 18 November 2013

Final day of filming


This day was the final day of film which we had to finish everything off and submit it. We were under a lot of pressure to get everything done. At this time of the year it got dark very quick so we calculated that we have until 16:00 to film all the way up to scene 4 to get everything done. As time passed we found that we had ran out of time but we had got most of the shots taken. At 20:00 after break we headed to Mayfair to shoot the Mayfair scene. we could not get to film on the bus because the bus was too buy at this time of the night. 
Here are some of the location shots we used. 




First day of editing in class

In this editing session we looked over our footage and established which footage could be used and what couldnt. We found that many of our footage was not useable. We also established that the audio in the Mayfair scene did no process. It was a huge blow which we were upset about. The footage came out fine but there was no audio. We tried to raise the audio from the camera file but it was too background noise. we now have to find a way to sort this out.

Monday, 11 November 2013

Second day of filming


We have now completed our second day of filming which was aimed to reshoot most of the first scene shots in better quality. The adjustments to the scripts were made so when had to film these new parts. We also re-shot the scenes where the lighting conditions were dark which was mostly scene 5. We did not complete the all of the scenes and the scene in Mayfair. When we go back to college we will look at the shots we got so far and make an analysis of what needs to be done again and what needs to be added. Looking back on this day I think our time management had improved from before but, we need to make a better effort to get more done due to our time running out.